Switch GPS on and wait for it to say LOCKED before you set off —
starting early costs the first hundred metres. It is an estimate, so at every point you know for
certain — a junction, an existing culvert, a kilometre post — tap the chainage and key in the true
value; that re-zeroes the GPS and stops small errors adding up.
Tap Start here, or pick a value, where an item begins; tap
End here where it stops. The app stamps the chainage and remembers the run. Nothing else is
disturbed, so you only ever touch what actually changed. A concrete U-drain or trapezoidal
drain automatically suppresses the V-ditch on that side for its length; the ditch resumes
on its own afterwards.
Corridor — Form A
Drainage — Form B
Pavement — Form C
Change log
Add at current chainage
Point items
Road
Form E — treatment rules
What the surveyor saw goes on the road. What is done about it is written once here. Agree these with the design engineer before the survey starts.
Form F — road data
A ! marks a template figure not yet confirmed for this road. Overhaul and haulage alone routinely move a bill by a quarter.
Checks
Survey summary
Finished roads held on this phone
Hand over to the Master Estimator
Upload the workbook (or the .json) to your Road BOQ Estimator web app — the address your organisation gave you. It is priced there and checked by two engines.
Working on the desktop workbook instead? It carries Forms A to F laid out exactly as they sit in the Master Estimator: open both files and paste each block into the sheet of the same name, starting at A5 — one sheet at a time, never whole rows. Then press Ctrl+Alt+F9 and read 90_Checks: all 27 tests must say OK. Nothing here produces a bill: pricing, taking-off and the BOQ stay with an engineer.