BESPA MEASUREMENT
No project loaded

New measurement

Load the site pack first (Setup).
Paid for this activity after this record (whole 50 m stations, rounded down)
—
Thicknesses, drain types and haul distances come from the design. The office's Estimator engines work out every item (materials, concrete, haulage) from what you record.

Site diary

Load the site pack first (Setup).

Weather

Labour on site

Plant

Materials delivered

Work done today

Activities due around this date in the programme. Add the chainages worked.

Instructions received

Delays

Incidents (safety, damage)

Visitors

Inspections at hold points

Load the site pack first (Setup).
Work at a hold point is paid only after a passed inspection, accepted by the Engineer's Deputy. Laboratory tests stay with the Laboratory.

Records

Items and dimensions

Set each item once; every record then computes its quantity from the From and To chainages. Lengths (m) need nothing; areas (m²) a width; volumes (m³) a width and a height, depth or thickness; litres a width and spray rate. Number, tonne and sum items take the quantity on each record. Bills from the Road BOQ Estimator arrive with these filled in.

Send to the office

Export the period's records as one file and send it to the office (e-mail, WhatsApp or USB). The office imports it into the Progress and Valuation app; the Engineer approves there.

Setup

No project loaded.

Who uses this phone

The Quantity Surveyor measures work for payment. The Site Supervisor keeps the daily site diary and inspects the hold points.
The site pack holds the roads, the BOQ items with their units and quantities, and the culverts. It holds no rates. Loading a newer pack of the same project keeps your records and dimensions.